Home K All Posts K NaturalSof in San Diego

NaturalSof Blog

NaturalSof in San Diego

NaturalSof City Spotlight: San Diego, California

The following is a list in and around the City of San Diego, California (originally posted March 27, 2019):

Client / Installation Location Application Information
 NaturaSof SDSU
  • Entire building protection on domestic supply
  • One unit on main supply before booster pump
  • One unit on hot water re-circulation loop
  • Time installed as of this post: 2 Years
 NaturalSof US San Diego  

  • Entire building protection on domestic supply at new complex at Park & Market
  • Unit on main cold water supply and hot water re-circulation loops based on pump GPMs
  • Time installed as of this post: 6 months – build still in process
 NaturalSof Sharp Hospital San Diego
  • Point of Use Heat Exchanger protection
  • One unit installed in 6″ line to protect
  • Time installed as of this post:  7 years
 NaturalSof National City Laundry
  • Hot Side only boiler protection
  • Two units matching pump GPM installed ahead of Lochinvar Armor Commercial Boilers
  • One Unit on hot water re-circ from building
  • Time installed as of this post: 18 months
 NaturalSof Soapy Joes
  • Whole building protection at FOUR locations
  • One unit at the backflow preventer at each location based on average water flow and usage at the sites
  • Time installed as of this post: 15 months
 NaturalSof Navy Lodge
  • Whole building protection on THREE buildings
  • One unit on each building main cold water supply and hot water re-circs based on pump GPM
  • Time installed as of this post: 18 months
 NaturalSof La Costa Glen  

  • Multiple building protection on domestic supply
  • One unit on main supply on each building
  • One unit on each hot water re-circulation loop
  • Time installed as of this post: 3 Years
 NaturalSof Casa de las Campanas  

  • Multiple building protection on domestic supply
  • One unit on main supply of each building
  • One unit on hot water re-circulation loop in each building
  • Time installed as of this post: 22 Months
 NaturalSof Fairfield Marriott  

  • Entire building protection on domestic supply
  • One unit on main supply
  • Two units on hot water re-circulation loops
  • Time installed as of this post: 2 Years
 NaturalSof 2626 6th Ave San Diego  

  • Luxury Condos, 1 per floor
  • One unit on supply to each condo / floor
  • Time installed as of this post: 3 Years
 NaturalSof Allegro San Diego
  • Entire building protection on domestic supply
  • Unit on main cold water supply in Parking Garage
  • Time installed as of this post: 7 Years
 NaturalSof Ariel San Diego
  • Across the street from Allegro – sister building
  • Entire building protection on domestic supply
  • Unit on main cold water supply in Parking Garage
  • Time installed as of this post: 7 Years
 NaturalSof Strata San Diego
  • Entire building protection on domestic supply
  • 2 Units on 2 main cold water supplies
  • 1 Unit in Boiler room on hot water recirc loop based on pump GPM
  • Time installed as of this post: 7 Years
 NaturalSof Rey San Diego
  • Entire building protection
  • One Unit on main cold water supply
  • Two Units on hot water re-circulation loops based on pump GPMs
  • Time installed as of this post: 6 months
 NaturalSof the Park San Diego
  • Entire building protection
  • One Unit on main cold water supply
  • Five Units on hot water re-circulation loops based on pump GPMs
  • Time installed as of this post: 20 months
 NaturalSof Alexan San Deigo
  • Entire building protection
  • One Unit on main cold water supply
  • Three Units on hot water re-circulation loops based on pump GPMs
  • Time installed as of this post: 18 months
 NaturalSof Park and Market San Diego
  • Entire building protection on domestic supply at new complex at Park & Market
  • Unit on main cold water supply and hot water re-circulation loops based on pump GPMs
  • Time installed as of this post: 6 months – build still in process
 NaturalSof Soboba San Diego
  • Entire building protection on Casino Side
  • One unit on main supply
  • One unit on hot water re-circulation loop
  • Time installed as of this post: 6 months, building opened Feb 2019